Enhanced Land Force Stage 2 – Singleton Deferred Works

PreviousNext
12345

St Hilliers was appointed Head Contractor for the Design and Construct of a 4 stage upgrade to the facilities at the Defence Base in Singleton. The scope of works included:

  • An urban operations training area (including a fake residential compound, a method of entry building, an urban firing direct fire support weapons wall, an urban firing building, targetry and range infrastructure, an administration area including an office building, an all-weather shelter, a toilet block and storage sheds);
  • An ammunition transfer point with two open sided sheds with concrete hard stands;
  • Refurbishment of the gravel hard stand, drainage works and refurbishment and reconstruction of the access track;
  • Refurbishment of the assault grenade range / static grenade range with refurbishment of the existing tower;
  • Modification of throwing bays and reconstruction of target areas; and
  • Demolition and removal of 39 redundant buildings and make good the landscaping and services.

Works were completed on an operational site and required careful planning and effective communication with base stakeholders to ensure maximum safety and minimal disruption. St Hilliers successfully established a flexible and collaborative working relationship with Defence throughout the delivery of the project, which allowed key events such as school march outs to remain uninterrupted and daily operational requirements of Base users to continue.

Value for money was created through a number of innovations due to St Hilliers’ extensive in house experience. One solution put forward by St Hilliers, was to redesign aspects of a proposed urban firing wall to minimise an unforeseen impact on an existing building which would have required its relocation. Furthermore, St Hilliers also put forward changes to proposed structure levels to optimise the existing site levels and minimise the need for extensive earthworks.

$6M

Contract Value

  • Location

    Singleton, NSW

  • Contract Type

    Head Contract (HC-1 2003) Design & Construct

  • Client

    Commonwealth of Australia – Department of Defence

  • Project Manager

    GHD

  • Completion

    April 2015

Most Recent Entries

Cultana Training Area Redevelopment Phase 1

CULTANA TRAINING AREA | state-of-the-art training establishment

Land 17 Phase 1B / 1C Storage and Simulator Facilities

Land 17 Phase 1B / 1C Storage and Simulator Facilities

Recent projects

  • HIET Training FacilitiesJanuary 25, 2018 - 2:37 pm
  • Harris Communications Head Office FitoutJanuary 9, 2018 - 1:47 pm
  • st hilliers civilBucketts Way Reconstruction Section 2 – Bucketts Way Landfill to TinoneeJanuary 24, 2017 - 6:43 am
  • Logan Village State SchoolJanuary 18, 2017 - 6:14 am

Latest news

  • Golden Oldies Animal RescueFebruary 23, 2018 - 10:17 am
  • Legacy Defence Charity Ball 2017September 6, 2017 - 3:41 pm
  • St Hilliers July NewsletterSeptember 1, 2017 - 8:47 am
  • St Hilliers Response to the Oaks Waterfront Resort ProjectSeptember 1, 2017 - 8:44 am
  • St Hilliers Commences Construction of Quest PenrithSeptember 1, 2017 - 8:44 am

Contact us

Western AustraliaSuite 15, 531 Hay St, Subiaco WA 6008.08 9380 8368.

QueenslandLevel 9, 333 Ann St, Brisbane QLD 4000.PO Box, 3315 South Brisbane QLD 4101.07 3212 6300.

New South Wales8 Windmill Street, Millers Point NSW 2000.PO Box, 5370 Sydney, NSW 2001.02 9259 5200.

Australian Capital TerritoryLevel 1, The Realm, 18 National Circuit, Barton ACT 2600.PO Box, 5370 Sydney NSW 2001.02 6171 6900.

© Copyright 2017 - St Hilliers Pty Ltd
  • Facebook
  • Linkedin
  • Rss
Fire Safety, Bushfire Rectification and General Building Works Air 5438 Phase 1A – Lead in Fighter Capability Assurance Program (LIFCAP)...
Scroll to top
Virginia